Monday, June 20, 2011

Week of 6/13




The panel configurations get worked as flat configurations then broken apart, reassembled and worked again. Looking at the stacks against the wall it became apparent this weekend that the stacks were configurations as well, so in a way to work them as an entire unit or configuration a blue line was painted that meandered across all of them. The edges of the panels really could be more of an important element in my final work than previously thought.


Current in-progress configurations.



Progress on Man with Stripped Shirt image, bottom shot being the most current.


14 of the 15 2x4 panels were built over the past week. Hopefully I can crank through the 18 2x2 this week and next, then rip a few of those squares into triangles, counter sink the nails, putty the holes, prime and sand everything in the next month. I really view the panel fabrication as part of the painting process.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.