Monday, May 21, 2012

anniversary


I haven't posted for quite a while, just thought I'd put up something that I just finished. This is all manual manipulation of individual frames. It took the better part of two days scanning and cropping with the frame rate of 26fps.

Monday, March 12, 2012

Week: 3/5-3/11




Above images: Combining some older panels that haven't seen the light of day for a while with some new panels — simply for the pleasure of looking at something new.




Above images: Continuation on newer images


Above: All done. 6 works ready to go to the gallery at the end of the month. Drilled, notched and signed, now to see if they fit into the car all at once. 

Wednesday, February 29, 2012

Week: 2/22–2/28

Painting:









Show Preparation:



Test hanging a painting in the garage.




Bolting panels together, building extra mount for cleat.




New table saw, (in background) - its already been put to good use getting these paintings ready for the April show at Art St. Louis. New panels have been getting built periodically, they are stacked along the wall on the left side of the photo. I am using birch plywood for these vs. the aspen. The birch seems to warp more than the aspen so I think once I get all of the reaming birch panels built I will revert back to the aspen.